Work Dongen

Posted on 21-02-2024 by F. Geurtsen

The transformation of the office building into 71 flats is progressing as forecast. Currently, the walls of the 71 flats are being plastered and the flats are getting the desired look. This week, the first kitchen will be installed in the model home and in the near future, the initiator will start writing to the more than 2,000 rental candidates.